Sangachal Power Station Foundation

Baku, Azerbaijan2022Energy
Sangachal Power Station Foundation - Image 1
Sangachal Power Station Foundation - Image 2
Sangachal Power Station Foundation - Image 3

Services Used

Borehole WorksField TestingLaboratory AnalysisPenetrometric Tests

Geotechnical investigation for a major 500MW combined cycle power plant near Sangachal terminal. The project involved foundation design support for turbine halls, cooling towers, and associated infrastructure on challenging coastal soils.

Challenge

Coastal location presented difficult ground conditions including loose sandy soils, high groundwater levels, and potential for liquefaction. Heavy turbine foundation loads required careful settlement analysis.

Solution

Executed extensive investigation including 28 boreholes, continuous CPT profiles, and comprehensive laboratory testing. Liquefaction potential analysis using multiple methodologies provided robust design recommendations.

Results

  • Complete soil profile characterization to 35m depth
  • Liquefaction risk zones mapped with mitigation recommendations
  • Pile foundation design parameters for 800-ton turbine loads
  • Groundwater control strategy for construction phase